MIL-DTL-3849C
4.3 Test equipment and inspection facilities. Test and measuring equipment and inspection facilities
of sufficient accuracy, quality, and quantity to permit performance of the required inspections shall be
used. The establishment and maintenance of a calibration system to control the accuracy of the
measuring and test equipment shall be in accordance with NCSL Z540-1 or equivalent.
4.3.1 Test conditions. Unless otherwise specified in the applicable test method, inspections shall be
conducted under the following environmental conditions.
a. Temperature: 15°C to 35°C.
b. Pressure:
Normal atmospheric.
c. Humidity:
Prevailing ambient (25 to 90 percent relative).
4.4 Materials inspection (see 3.3). Materials inspection shall consist of certification supported by
verifying data that the materials listed in table II, used in fabricating the designated cord type classes (see
3.1 and 3.3), are in accordance with the applicable referenced specification or requirements. Materials
inspections hall be performed prior to such fabrication.
TABLE II. Materials inspection.
Requirement
Applicable
Material
paragraph
specification
Tinsel wire
3.3.1
MIL-W-3795
Separators
3.3.2.1
MIL-C-572
Fillers and binders
3.3.2.2
MIL-C-572
Staycords
3.3.2.3
MIL-C-572
Outer braid
3.3.2.4
MIL-C-572
Insulation
3.3.3
Slash sheet
Jacket
3.3.4
Slash sheet
4.5 Conformance inspection. Conformance inspection shall consist of Group A (see 4.5.2) and
Group B (see 4.5.3) inspections, and shall be performed on every lot of cord procured under this
specification (see 4.5.4.1).
4.5.2 Group A inspection. Group A inspection shall consist of the inspections specified in table III.
Group A inspection may be performed at an appropriate stage of the manufacturing operation rather than
on the finished cord.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business