MIL-DTL-13777K
3.8.4 Ozone resistance. After testing in accordance with 4.8.4.1.4, the sheath shall exhibit no visible cracks
when examined under a glass having a magnification of three diameters.
3.9 Workmanship. Cable furnished under this specification shall be manufactured in a thoroughly workmanlike
manner. All material shall be sound, of uniform quality and condition, and free of cracks and other defects
which may adversely affect its serviceability.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a. Qualification inspection (see 4.4).
b. Conformance inspection (see 4.6).
4.2 Test equipment and inspection facilities. Test equipment shall be of accuracy appropriate to the tolerances
for requirements specified herein and the applicable specification sheet. Test and measuring equipment and
inspection facilities having sufficient accuracy, quality and quantity to permit performance of the required
inspection shall be established and maintained by the contractor. The establishment and maintenance of a
calibration system to control the accuracy of the measuring and test equipment shall be in accordance with
4.3 Inspection conditions. Unless otherwise specified herein, all examinations and tests shall be performed at
68º to 95ºF at barometric pressure of 28 to 31 inches of mercury, and at a relative humidity of 80%, maximum.
4.4 Qualification inspection. Qualification inspection shall be specified in table VI and shall be performed at a
laboratory satisfactory to the qualifying Government activity (see 6.3).
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business