MIL-DTL-5898H
4.5.2 Group A inspection. Group A inspection shall consist of the inspections specified below.
Group A inspection may be performed at an appropriate stage of the manufacturing operation rather than
on the finished cord.
a. Conductor resistance.
b. Dielectric strength.
c. Insulation resistance.
d. Workmanship.
4.5.3 Group B inspection. Group B inspection shall consist of the inspections in table VIII conducted
on a sampling basis.
TABLE VIII. Group B inspection.
Inspection
Requirement
Verification
Identification
Outside diameter of conductor
Outside diameter of cord
Staycord, diameter
Staycord, breaking strength
Isolation
4.5.3.1 Sampling. A random sample shall be selected from each lot. The sample size shall be
based on the lot size from which the sample was selected. Sampling inspection shall be as specified in
table IX.
TABLE IX. Inspection sample.
Lot size 1/
Sample Size
1 to 8
2
9 to 90
3
91 to 150
12
151 to 280
19
281 to 500
21
501 to 1,200
27
1,201 to 3,200
36
3,201 to 10,000
38
10,001 to 35,000
46
1/ Lot size is based on the number of units of product (see 4.5.1.1).
4.5.3.2 Specimen length. Unless otherwise specified herein, the specimen shall be of the length
specified in the applicable test method.
4.5.4 Rejected lot. Failure of a lot to pass any test or inspection constitutes failure of the lot and the
lot shall be rejected. If an inspection lot is rejected, the contractor may rework the lot to correct the
defects, or screen out the defective units and resubmit the lot for re-inspection. Such lots shall be
separated from new lots and shall be identified as re-inspected lots.
10