MIL-DTL-5846D
3.6 Workmanship. The wire shall be constructed and finished in a thoroughly
workmanlike manner. Particular attention shall be given to neatness and to freedom of
parts from burrs and sharp edges.
4. VERIFICATION
4.1 Preproduction inspection. Unless otherwise specified in the contract or purchase
order, preproduction inspection shall be performed by the supplier, after award of
contract and prior to production, at a location acceptable to the Government.
Preproduction inspection shall be performed on sample units which have been produced
with equipment and procedures normally used in production. Preproduction approval is
valid only on the contract or purchase order under which it is granted, unless extended by
the Government to other contracts or purchase orders. (see 6.4)
4.1.1 Sample size. Preproduction inspection sample(s) shall consist of 50 feet of each
type and class of wire on contract or purchase order.
4.1.2 Inspection routine. The samples shall be subjected to the inspections specified in
Table VII as described under 4.3 methods of examination and test.
Table VII. Preproduction inspection routine.
Type
1
2
3
4
Class
ABCDE
A
A
A
X
X
X
General
XXXXX
Inspection
X
X
X
Electromotive
XXXXX
Force
X
X
X
XXXX
Resistance
Dielectric
X
X
X
XXXX
Strength
Insulation
X
X
X
XXXX
Resistance
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business